Edgar 360

A 17-floor office tower. The last part of Edgar’s office complex in the project that houses the German embassy.

In this project, special protection systems which conform to European protection standards were added to the client’s request, at a high level of performance and in accordance with standards.

Alongside curtain walls in a radial line that combine projected hidden windows for opening, glazed curtain walls were developed, resistant to blast and force- entry, and windows that are resistant to blast and force- entry at different levels of protection.

 

 

 

Design: Basman/Tenenbaum Development: Binternet